I did the front arms, in the winter, outside, in about 5 hours. That included new rotors/pads, one tie rod, stabilizer sway bar end links, and one side stabilizer sway bar mount.
Grinder with cut off disks, and sawzall with Diablo CARBIDE blades various lengths. You need the carbide blades...